Coating line series
Classification:
Key words:
Catalytic combustion equipment | spray paint room | RTO catalytic combustion equipment
Hotline:
0531-83543888/83383888
Detailed introduction
Graphic Details


A coating line is a production line that goes through the following series of operations.
|
Input products |
Put the coated material on the plug-in and start working. |
|
electrostatic dust removal |
Remove the oil and dust brought by injection molding. |
|
Preheating |
In order to better color the coated object a little temperature |
|
Primer spraying |
Cover the color of the plastic itself and spray the background color for the production requirements. |
|
Drying |
Through the temperature of the IR zone in the tunnel, the semi-dry state is carried out in preparation for the next spray. |
|
Surface spraying |
Spray the color required to be painted |
|
slip-flat and dry |
Slipping through tunnel, drying |
|
UV spray curing |
Cooperate with UV coating and use the required color amount (800 ~ 1200mj) of the coating in UV365nm light to cure instantly. |
|
SHIPMENT AND CHECK PACKAGING |
|


1. Production management of pre-treatment section of coating line
Pre-treatment has manual simple process and automatic pre-treatment process, the latter is divided into automatic spray and automatic immersion spray two processes. The workpiece must be surface treated to remove oil and rust before dusting. In this section used more liquid, mainly rust remover, degreasing agent, surface adjustment, phosphating agent and so on.
In the pre-treatment section or workshop of the coating production line, the first thing to pay attention to is to formulate the necessary purchase, transportation, storage and use system of strong acid and alkali, to provide workers with necessary protective clothing, safe and reliable dressing, handling and configuration equipment, and to formulate emergency treatment measures and rescue measures in case of accidents. Secondly, in the pre-treatment section of the coating production line, due to the existence of a certain amount of waste gas, waste liquid and other three waste substances, so in terms of environmental protection measures, must be equipped with gas exhaust, liquid discharge and three waste treatment devices.
The quality of the pre-treated workpiece is different due to the different process flow of the pre-treatment liquid and the coating production line. Good processing of the workpiece, the surface oil, rust, in order to prevent a short time again rust, generally should be in the pre-treatment after a few processes, phosphating or passivation treatment: before spraying, should also be phosphated workpiece drying, to its surface moisture. Small batch single-piece production, generally using natural drying, drying, air drying. For large-scale flow operations, low-temperature drying is generally adopted, using ovens or drying channels.
2, the organization of powder coating production
For small-batch workpieces, manual dusting devices are generally used, while for large-batch workpieces, manual or automatic dusting devices are generally used. Whether it is manual dusting or automatic dusting, it is very important to keep the quality off. To ensure that the sprayed workpiece powder uniform, consistent thickness, to prevent thin spray, leakage spray, wipe off and other defects.
In the process of coating production line, attention should also be paid to the hook part of the workpiece. Before entering curing, the powder attached to it should be blown off as much as possible to prevent the excess powder on the hook from curing. If it is really difficult to remove the remaining powder before curing, the cured powder film on the hook should be peeled off in time to ensure good conductivity of the hook and facilitate easy powdering of the next batch of workpieces.
3, coating line curing process production management.
Matters needing attention in this process include: if the sprayed workpiece is produced in small batches, pay attention to prevent the powder from falling before entering the curing furnace. if there is any powder wiping phenomenon, the powder should be sprayed in time. Strictly control the process, temperature and time during baking, and pay attention to prevent color difference, overbaking or insufficient curing caused by too short time.
For large quantities of workpieces automatically conveyed, before entering the drying tunnel, it is also necessary to carefully check whether there is leakage, thinning or local dusting. If unqualified parts are found, they should be closed to prevent entering the drying tunnel and heavy spraying should be removed as much as possible. If individual workpieces are unqualified due to thin spraying, they can be re-sprayed and cured again after curing out of the drying tunnel.

1. Attention should be paid to the installation and hanging of the coated objects on the coating production line. Design the installation and hanging method of hanging tools and objects on the coating production line through trial immersion in advance to ensure that the workpiece is in the best position during dipping. The maximum plane of the object to be coated should be close to vertical, and the other planes should be at an angle of 10 °-40 ° to the horizontal, so that the remaining paint can flow smoothly on the coating surface."
2. In order to prevent the spread of solvent in the workshop and dust from falling into the paint tank on the coating production line, the dipping tank should be protected.
3. After large objects are dipped on the coating production line, they should be sent to the drying room after the solvent is basically volatilized.
4, coating should continue to pay attention to the determination of coating viscosity, each shift should be measured 1-2 times viscosity, if the viscosity increases more than 10% of the original viscosity, it should be timely supplement solvent. Dip coating should be stopped when solvent is added. After stirring evenly, the viscosity is measured, and then the operation is continued."
The thickness of the paint film is mainly determined by the rate of lifting the object on the coating production line and the viscosity of the paint liquid. After controlling the viscosity of the paint liquid according to the above requirements, the coating production line should determine the appropriate lifting rate according to the maximum speed limit of the paint film of about 30um and according to different equipment. Lift the coated article evenly at this rate. The lifting rate is fast, and the paint film is thin; the lifting rate is slow, and the paint film is thick and uneven."
6. When dip coating is carried out on the coating production line, the thickness difference of the paint film applied and the lower part is sometimes caused, especially the hypertrophy accumulation occurs at the lower edge of the coated object. In order to improve the decoration of the coating, the excess paint droplets are removed manually with a brush during small batch dipping, or these paint droplets can be removed by centrifugal force or electrostatic attraction equipment."
7. When dipping wooden parts on the coating production line, pay attention to the time not too long, so as to avoid the wood inhaling excessive paint, causing slow drying and waste.
8. Strengthen ventilation equipment to prevent the harm of solvent vapor; pay attention to the arrangement of fire prevention measures and regularly check the coating production line.

Related Content
Online message
Company address: Diaozhen, Zhangqiu District, Jinan City, Shandong Province, China
Official Website
Sweep code attention